Principal’s Experience

Experience behind the practice.

Projects delivered by CGP’s principal at prior firms across Texas, California and Oklahoma. They are shown to illustrate experience and are not projects performed by CGP.

Case Studies

A closer look at the work.

Each project below was delivered by CGP’s principal while at prior firms; roles shown are the principal’s. Additional projects and references are available on request.

Case Study 01

Mt. Vernon Avenue Viaduct, Design-Build

Location San Bernardino, CA
Delivery Design-Build, PS&E with construction support
Leadership role Deputy PM · Lead Civil Designer
Construction value $165M

As technical civil subconsultant to the design-build team, the principal developed the geometric alignments carrying the new viaduct over the BNSF rail yard, setting the roadway profile of the bridge and Mt. Vernon Avenue while minimizing impacts to local cross streets. Soffit elevation, settlement and deck thickness criteria were coordinated directly with the bridge engineer.

The principal directed street improvement plans for Cabrera Avenue, Kingman Street, Mt. Vernon Avenue, 2nd and 3rd Streets and a new alley; supervised field surveys of existing conditions; and oversaw water, sewer, hydrology and storm drain plans, temporary construction easements and ADA compliance. Five traffic signals were modified with temporary standards for the detour route.

Geometrics Street improvements Drainage Signals & lighting Traffic management
Case Study 02

3rd & 5th Street Corridor Improvements

Location City of Highland, CA
Delivery PS&E civil improvements with construction management
Leadership role Deputy PM · Assistant Resident Engineer
Construction value $15M

Survey and civil design for more than a mile of street improvements along the south side of 5th Street, portions of 3rd Street and a new connection between 5th Street and 3rd Street / Church Avenue, including three signal modifications, corridor lighting and drainage design.

A full-coverage topographic survey of the corridor fed a Civil 3D roadway model. The principal oversaw asphalt and jointed plain concrete pavement design, coordinated sewer, water, gas and electrical relocations with East Valley Water District, SoCalGas and SCE, and directed more than 20 temporary construction easements.

Corridor design Signal modifications JPCP & HMA Utility relocation TCEs
Case Study 03

Gate 1 Access Road

Client San Bernardino International Airport Authority
Delivery Rapid-delivery PS&E with construction management
Leadership role Project Manager · Lead Civil Engineer
Construction value $8M

4,800 feet of new airport access roadway designed in three months, covering street improvements, traffic signal modification, street lighting, utility coordination, drainage and an ADA path of travel at a secure facility.

The principal directed field surveying, right-of-way surveys, utility investigations and as-built research, and ran a concrete-versus-asphalt pavement cost-benefit analysis. Power for site lighting, guard shacks and the rolling gate was drawn from an existing building, bypassing the typical lead time for a new utility service connection.

Airport Fast-track Pavement analysis Lighting Secure site
Case Study 04

ATP Cycle 4 Safe Routes to School

Location City of Ontario, CA
Delivery Grant-funded PS&E civil improvements
Leadership role Project Manager · Lead Civil Engineer
Construction value $12M

Pedestrian and street improvements around Haynes, Vista Grande and Oak Schools to improve ADA access and create a safe path of travel for students, funded through the state Active Transportation Program.

Scope included field surveying and PS&E for street widening, driveway reconstruction, drainage, utility identification and relocation, sidewalks and ADA curb ramps to Caltrans Standard Plans. The principal defined the construction footprint and permanent and temporary acquisitions, and coordinated design of a pedestrian hybrid beacon (HAWK) signal and street lighting.

ATP grant ADA HAWK signal Right of way School zones

Project Index

Selected state, MPO and public works projects.

Texas

5 projects

US 59 Expansion

TxDOT Yoakum District · Wharton County

Schematic update & PS&E civil improvements

Roadway Task Lead PM

$600M

US 380 Super 2 Lanes

TxDOT Fort Worth District · Jack County

PS&E civil improvements

Roadway Task Lead · QC Manager

$14M

I-35 Schematic Alternative, SH 130 to SH 45

TxDOT · Williamson County

Schematic alternative, Segment 1 (SH 130 to SH 29)

Quality Manager

$350M

Frankford Road Reconstruction

City of Carrollton

PS&E civil improvements

Quality Manager, PS&E deliverables

$15M

East Virginia Parkway

City of McKinney

PS&E civil improvements

Quality Manager, PS&E deliverables

$13M

Oklahoma

1 project

I-40 Corridor Study

Oklahoma

Corridor study & pavement assessment

Pavement Assessment Task Lead

Study

California

7 projects

High-Speed Rail On-Call ROW Engineering & Surveying

California High-Speed Rail Authority · Fresno–Bakersfield

On-call right-of-way engineering & surveying

Project Manager

$35B program

Mt. Vernon Avenue Viaduct (Design-Build)

San Bernardino

PS&E civil improvements with construction support

Deputy PM

$165M

3rd & 5th Street Corridor Improvements

City of Highland

PS&E civil improvements with CM

Deputy PM

$15M

Gate 1 Access Road

San Bernardino Intl. Airport Authority

PS&E civil improvements with CM

Project Manager

$8M

Sterling Avenue Upgrade 2020

San Bernardino Intl. Airport Authority

PS&E civil improvements with CM

Project Manager

$4M

ATP Cycle 4 Safe Routes to School

City of Ontario

PS&E civil improvements

Project Manager

$12M

Real Journey Academies Street Improvements

City of Highland

Street, signal & median improvements with construction support

Lead Civil Engineer · Asst. Resident Engineer

$450K

Want references or project sheets?

Project sheets, a resume and references are available on request. Explore the core services below.